ADU Company in Westminster — Design, Permits and Build Under One Contract

We handle the design, the engineering, and the city permit, then build it. One contract, one crew, one accountable point of contact. Free feasibility check on your lot before you commit.

✓ Licensed & Insured ✓ Written quotes ✓ Permits handled
Schedule Free Estimate

Call to schedule your free estimate

🛡 Licensed & Insured 📝 Written Fixed-Price Quotes 💲 No Change Orders · Free Estimates

ADU Company in Westminster, CA

Kitchen remodeling in Westminster usually means working inside a 1950s or 60s ranch home with original galvanized plumbing and a 100-amp electrical panel that’s been asked to do too much for decades. We rebuild these kitchens around how Westminster families actually cook – which often means a separate wok station, a second prep sink, and ventilation that can handle high-heat cooking without setting off every smoke alarm in the house. Home Base ADU Builders has served Westminster since 2016, and we approach every kitchen here as a structural project first and a design project second. Call (866) 403-9834 for a free estimate on your Westminster kitchen.

Call (866) 403-9834

Why Westminster Homes Are Different

Westminster’s housing stock is dense, post-WWII tract construction – mostly single-story California ranches and stucco boxes on 5,000 to 6,500 square foot lots. The homes were built fast in the 1950s and 60s, and the infrastructure shows it. Original galvanized supply lines corrode from the inside and eventually throttle water pressure to a trickle. The 100-amp electrical panels that were standard then can barely run a modern kitchen with an induction cooktop, let alone an ADU drawing on the same service.

The climate matters too. Westminster sits close enough to the coast that winters are cool and damp, with morning marine layer hanging around well into summer. Houses here need real moisture management – proper venting in kitchens and baths, exterior materials that won’t swell or rot, and a plan for the condensation that collects on single-pane windows. We routinely open walls and find exactly what you’d expect from a 70-year-old stucco house: a little dry rot, some questionable wiring, and plumbing that’s past its service life. None of it is unusual. All of it needs to be addressed before finish work begins.

Westminster also has a distinct cultural layer that changes the work. A large portion of homeowners are Vietnamese-American, and many of them want kitchens and ADUs designed for multigenerational living. That means separate entrances for grandparents, secondary cooking areas with dedicated wok burners and serious exhaust, and layouts that let two households share a lot without sharing every meal. A contractor who treats Westminster like every other Orange County city will miss those requirements entirely.

Our Main Westminster Services

Westminster homeowners reach out to us about two things more than anything else: building an ADU on a tight lot, and bringing a dated bathroom up to modern function. Both have dedicated Westminster pages with full detail.

ADU Builders in Westminster

ADUs in Westminster almost always go in the backyard of a ranch home where the garage is attached at the front and the rear yard is shallower than people expect. That means the typical 400 to 600 square foot detached unit replaces a patio or a fruit tree, and the footprint has to be adjusted to keep whatever citrus the homeowner refuses to part with. We handle the full project – design, permits, foundation, utility upgrades, and finish work – and we work across prefab brands like Mighty Buildings, Boxabl, and Plant Prefab as well as custom site-built units. See our ADU Builders in Westminster page for full pricing and process details.

ADU Builders in Westminster

Bathroom Remodeling in Westminster

Westminster bathrooms from the 1950s and 60s are small – often a 5×8 footprint with a tub, a toilet, and a pedestal sink squeezed in. The original tile is set on a mud bed that’s cracked, the cast iron drain lines are scaled from decades of hard water, and there’s usually no exhaust fan because the code didn’t require one when the house was built. We rebuild these spaces with proper waterproofing, real ventilation, and layouts that make a small bathroom work harder. See Bathroom Remodeling in Westminster for cost breakdowns and timelines.

Bathroom Remodeling in Westminster
Need help today?Fast, friendly service and a no-obligation free estimate.

Call (866) 403-9834

What happens when you call

  1. 1
    A real person answersNo phone trees — you reach a local pro.
  2. 2
    You get an upfront price rangeHonest numbers before anyone is dispatched.
  3. 3
    A background-checked tech heads outLicensed & insured, dispatched right away.
  4. 4
    You approve before work beginsNothing starts until you say go.

Kitchen Remodeling in Westminster

A Westminster kitchen remodel means working inside a house built before kitchens were designed for dishwashers, microwaves, or anything beyond a single oven and a four-burner range. The original footprint is usually closed off from the living area, the plumbing is galvanized steel that’s rusting from the inside, and the electrical panel doesn’t have room for the circuits a modern kitchen needs. Homeowners here want open floor plans, better storage, and – very often – a secondary cooking station with a dedicated wok burner and serious ventilation. We plan every Westminster kitchen remodel around the plumbing and electrical upgrades the house needs first, then build the kitchen on top of that. For a broader look at how we approach kitchen work, see our Kitchen Remodeling overview.

Full Kitchen Renovation

Signs you need it

You’re working around cracked tile counters, cabinets with swollen particleboard frames from years of coastal moisture, and a layout that puts the refrigerator in the hallway.

What it costs in Westminster

A full kitchen renovation in Westminster typically runs $25,000 to $55,000 depending on cabinet construction, countertop material, and whether the wall between kitchen and living room comes down.

How we do it

We open the walls to inspect framing and plumbing, replace galvanized supply lines, upgrade the panel if needed, then install new cabinets, counters, flooring, and fixtures in sequence.

Wok Kitchen Addition

Signs you need it

Your high-heat cooking sends smoke and oil vapor through the whole house because a standard range hood can’t move enough air.

What it costs in Westminster

A dedicated wok kitchen or secondary cooking station in Westminster runs $12,000 to $22,000, driven mostly by the high-CFM exhaust system, fire-rated separation, and dedicated gas or induction line.

How we do it

We build a compact secondary cook zone with a commercial-style hood, stainless backsplash, and a dedicated gas stub or high-amperage circuit, vented directly outside through the roof or side wall.

What Kitchen Remodeling Costs in Westminster

Item Typical range in Westminster
Full kitchen renovation $25,000 – $55,000
Wok kitchen or secondary cooking station $12,000 – $22,000
Galvanized plumbing replacement (whole house) $4,000 – $8,000

How long does a kitchen remodel take in Westminster?

A full kitchen remodel in Westminster takes six to ten weeks from demo to final walkthrough, and the biggest variables are panel upgrades, plumbing replacement, and whether you’re moving walls. We’ll give you a written schedule before we start.

Do I need a permit to remodel my kitchen in Westminster?

Yes, Westminster requires permits for any kitchen remodel that moves plumbing, adds circuits, or alters load-bearing walls. We pull all permits, schedule inspections, and handle corrections directly with the city.

Brands We Service in Westminster

We work directly with Mighty Buildings, Boxabl, and Plant Prefab for Westminster ADU projects, plus Tuff Shed for conversion builds. Because we’re already running jobs with these manufacturers, we can get answers on lead times and design constraints faster than a builder who has to call a rep cold. See our brands page for a full comparison.

Pricing for ADU Company in Westminster, CA

Service Typical range in Westminster
Full kitchen renovation $25,000 – $55,000
Wok kitchen or secondary cooking station $12,000 – $22,000
Galvanized plumbing replacement (whole house) $4,000 – $8,000
Bathroom remodel (full) $18,000 – $35,000
Bathroom remodel (cosmetic refresh) $8,000 – $15,000
ADU construction (detached, 400 – 600 sq ft) $150,000 – $250,000
ADU site work and utility upgrades $15,000 – $30,000
Garage conversion to ADU $120,000 – $200,000

What pushes Westminster prices up is what’s hiding inside the walls – corroded galvanized plumbing, 100-amp panels that need a 200-amp upgrade, and sometimes cast iron drain lines that have to be sleeved or replaced. You get a fixed, line-item quote before work starts, and the price doesn’t change unless you change the scope.

Neighborhoods We Serve in Westminster

We work throughout Westminster, including the older ranch tracts south of Westminster Boulevard and the slightly newer developments up toward the 22 freeway. Most of our projects are in the 92683, 92684, and 92685 ZIP codes. We typically start a Westminster job within four to six weeks of permit approval, depending on the scope.

  • Bolsa Chica Heights
  • Little Saigon area
  • Westminster Village
  • Magnolia Park area
  • William Still Park neighborhoods

Service Area – Cities Near Westminster

Home Base ADU Builders runs projects across Westminster and the surrounding communities. We’re currently active in Midway City, CA, Garden Grove, CA, Stanton, CA, and Huntington Beach, CA. If your home is within a 30-minute drive of Fountain Valley, we can likely schedule an estimate.

Serving Westminster, CA — Our Local Coverage Area

We’re based in the Westminster area and know this community well. Use the map below to see our service coverage — if you’re nearby, we can almost certainly help.

FAQs About ADU Company in Westminster

Ready to get started? Free estimates · Free written quotes response in Westminster
Call (866) 403-9834

What happens when you call

  1. 1
    A real person answersNo phone trees — talk to a local adu pro.
  2. 2
    You get an upfront price rangeHonest numbers before anyone is dispatched. No surprises.
  3. 3
    We come out and measureLicensed & insured, at a time that suits you — the visit and the quote are both free.
  4. 4
    You get the price in writingLine-itemed, yours to keep, and nothing starts until you say go.

What Westminster Customers Say

★★★★★ 4.8 from 4+ reviews

"Sound insulation between the unit and the main house is better than I expected. You genuinely cannot hear the tenant."

— Luis Garcia

"Unit came out great and the tenant is happy. The timeline ran long, largely because of how slow the city was on plan check, though a couple of the delays were scheduling on their end."

— Robert Hayes

"Detached unit in the back yard. Utilities trenched, separate meter, and it passed final on the first inspection."

— Colleen Pruitt

How It Works in Westminster

Getting your adu handled is simple and fast.

1

Call or Request a Free Estimate

Tell us about your adu needs and we provide an upfront, transparent quote — no obligation, no hidden fees.

2

Licensed Technician Dispatched

A background-checked, certified technician arrives in Westminster — typically within 30–60 minutes, with parts stocked on the truck.

3

Problem Solved, Guaranteed

We complete the job to your full satisfaction, backed by our warranty and 100% satisfaction guarantee.

Request a Free Estimate

Tell us what's going on in Westminster — we'll get back to you fast. No obligation.

By requesting your free estimate, you acknowledge our Privacy Policy and agree to be contacted through phone, text, or email regarding your service needs, including from the affiliated professionals who may take on the job.

Prefer to text? Send a Text
Call Now - 24/7 Dispatch
Areas We Serve
Call Now - 24/7 Dispatch